Construction of New Bridge Begins with Arrival of Crane and Set-up The crane is here! Set-up begins. The bridge sections begin to arrive, and are staged at a closed restaurant just down the street. A quick stop on 96th Street with the police providing traffic control, then a long reverse 1,000’ down the road to the crane.