5/17/2024 – Work Begins on the Storm Sewer on the Other Side of the Bridge Today Coiled pipes for storm sewer installation have arrived, marking the start of the project on the other side of the bridge. Various construction materials and equipment for storm sewer installation are set up, indicating the beginning of the project.